Roof
Pre-insulated roof
Image gallery: On-site insulated roof
Positioning the rafters with the notch, underside of the fascia and the under-roof membrane
Application of underlay boards or above-rafter insulation
Installing battens and conter battens
Fastening of the bargeboard at ergonomic working height
Pre-insulated roof
Schematic diagram: Production of box slab roof elements
Glue the vapor barrier, apply insulation, fascia board, underlay, counter battens, roof battens and bargeboard.
Factory mounting of heating panels on fully insulated roof underside
Roof with dormer
Half valley rafter
Exposed roof truss with dormer
Insulating in record time
Exposed roof truss with dormer
Flat roof elements with protruding upper beam
and factory-made flat roof sealing
Butterfly roof
Rafter layer
First sealing layer and skylight domes
Gable end details
Over hanging elements with facias
Fully off-site insulated roof structure with visible 3-layer panel as a finished ceiling.
Adjust 1 time Tectofix, create element row and repeat process 7 times
A very fast covering installation is possible, as "almost unlimited" - Only a few edge cuts are required
Insulating the roof elements
Craning the elements with a load liflting traverse
Easy-to-install hinges ensure the necessary airtightness at the element joint
Trade building