Wall

Video

Wall

Gable wall

Picture gallery

Wall production on tectofix with wall framing bracket + end stop

ergonomic, due to walkability 

Setting up of the bottom plate support

Bottom plate support bracket with longitudinal stop

Positioning of the side stop by a proven clamping technology

Instal the clamping system

Setting up the end position

Clamping with cordless drill

Trimmer

Window framing

Laying and fixing the initial planking

Milling of openings

Opening the clamping devices

Turning the wall after initial planking

Left: Laying another wall on tectofix 
Right: The turned wall lies on the third longitudinal beam at an ergonomic height (for insulation work and external planking).

Slanting stops