Wall
Video
Wall
Gable wall
Picture gallery
Wall production on tectofix with wall framing bracket + end stop
ergonomic, due to walkability

Setting up of the bottom plate support

Bottom plate support bracket with longitudinal stop

Positioning of the side stop by a proven clamping technology

Instal the clamping system

Setting up the end position

Clamping with cordless drill


Trimmer



Window framing

Laying and fixing the initial planking

Milling of openings

Opening the clamping devices



Turning the wall after initial planking


Left: Laying another wall on tectofix
Right: The turned wall lies on the third longitudinal beam at an ergonomic height (for insulation work and external planking).

Slanting stops

